Services: Erection / Installation

We assist customers in shifting and construction of new power plant and provide services starting from engineering & design, transportation, supply of equipments, inspection, project execution (including erection, piping), chimney (including material), getting statutory approvals, etc.

The major projects executed by us are as under.

Experience of erection, dismantling and re-erection of DG Sets / Project Implementation for diesel based Power Plants:

Supervision of re-erection of 1 x 4 MW Fuji DG Set from Harihar polifibres/ Harihar to M/s Vikram Cement in 1992

Shifting & Re-erection of 1 x 4 MW Fuji DG Set from M/s Birla Cement Works/ Chittorgarh(Rajasthan) to M/s Satna Cement        Works/Satna (MP) in 1993

Erection of 2 x 4 MW Niigata DG Sets at M/s Jindal Polyester/ Bullandshahr (UP) in 1995

Erection of 1 x 4 MW Niigata DG Set at M/s Jindal Polyester/ Nasik (Maharashtra) in 1996

Shifting & Re-erection of 1 x 4 MW Fuji DG Set from Satna Cement Works/ Satna (MP) to M/s Birla Corp Raebarelli (UP) in 1998

Erection of 1 x 4 MW Niigata DG Set at M/s Jindal Polyester/ Nasik (Maharashtra) in 2001

Shifting & Re-erection of 1 x 6 MW Mirrlees Blackstone 12KV Major MK3 DG Set from M/s Vasavadatta Cement/ Sedam       (Karnataka) to M/s Hindustan Heavy Chemical/ Calcutta (West Bengal in 2002/2003

Modification / structural work for handing over operations of Caterpillar 1x9CM32 Gas based Genset at M/s Garden Silk Mills/ Surat       for M/s Caterpillar Commercial Pvt Ltd in 2003

Alignment, fabrication, erection work for new Wartsila 6 MW DG Set & equipment at M/s Saurashtra Cement Ltd, Ranavav in 2003

Design Engineering & Supply of Jacket Water Heating System for 2.5 MW Fuji DG Set at M/s Reliance Industries Ltd, Patalganga.       (Completed in 2000)

Design, Engineering & Supply of Fuel Oil Blending System (4000 Ltrs) for Blending HSD and Furnace Oil for M/s Jaiprakash              Industries, Rewa. (Completed in 2003)

Design, Engineering, Procurement, Supply, Erection & Commissioning of 12 Nos. of Mechanical Subsystems for 2.4 MW DG Sets        being supplied by M/s Diesel Locomotive Works, Varanasi at M/s Nuclear Power Corporation, Kaiga/Kota

Erection & commissioning of 1x8 MW Niigata DG Set including Tanks, Ducting Piping, Chimney etc at M/s Jindal Polyester Ltd,        Nasik. (Completed in June 2005)

Supervision of erection & commissioning of 1X6.3 MW Wartsila DG Set Model 18V32 at M/s Ambuja Cement Eastern Ltd, Sankrail in        2007 under contract from M/s Omcons Engineering Pvt Ltd

Dismantling & re-erection of new equipments, fabrication & erection of piping for energy conservation/reduction of operating costs       at Poly Plant for M/s Jindal Polyester Ltd, Nasik in 2007

Dismantling & loading of 3 x 10 MW MAN B&W Power Plant at M/s FACOR/ Vizianagaram

Dismantling & loading of 1x4 MW Warsila DG Set Power Plant at M/s SPENTEX/ Indore

Erection & Commissioning of 4x3600 MW Emergency DG Set at NPCIL/ Kalpakkam for M/s Kirloskar Oil Engines including Seismic       testing assistance (in progress)

Lifting & Shifting of Gas Turbine Generator & Steam Turbine Generator at M/s Indian Petrochemicals Corporation Ltd, Nagothane in       2007

Fabrication, Erection, Testing & Commissioning of Piping Network & associated ducting and structural work for Coal Fired Thermic       Fluid Heater project At M/s Jindal Polyfilms/Nasik in 2009

Re-erection & commissioning of 1x 10 MW powerplant consisting of 12v48/60 Man B& W Dg Set and associated auxiliaries, piping,       ducting, structural etc at M/s Green Valliey Industries Ltd /Meghalaya in 2010

Re-erection & Commissioning of 1x 3.2MW powerplant consisting of 1 x 12V32G Fuji Dg Set and associated auxiliaries, piping,       ducting, structural etc at  M/s ACC Ltd / Madukkarai in 2010

 
Copyright © 2010 Fuji Technical Services Pvt Ltd. All rights reserved. All trademarks and copyrights acknowledged.
This website is designed, developed, hosted & maintained by  Nair Technologies Pvt Ltd, Nerul, Navi Mumbai, India